Open-concept kitchens
Removing a Load-Bearing Wall for an Open-Concept Kitchen
Taking down the wall between your kitchen and living room changes how the whole floor works: more light, clear sightlines and room for a proper island. When that wall holds up part of the house, it needs an engineer’s design, the right beam and a building permit. We handle all three, then build the new kitchen around them.
First question
Is Your Wall Load-Bearing?
A few clues suggest it might be:
Runs across the joists
It runs across the joists above, not alongside them.
Near the middle
It sits near the middle of the house.
Support underneath
There is a wall, beam or post directly below it in the basement.
A floor above
There is another floor above it.
Clues are not proof; an engineer or qualified designer should decide. In condo towers, interior walls can be concrete and part of the building’s structure, and they usually cannot be removed.
Where the weight goes
Why an Engineer Is Needed
A load-bearing wall carries the weight of the floors, roof and everything on them down to the foundation. Take the wall away and that weight still has to go somewhere. A structural engineer works out the loads and specifies:
- The beam: engineered wood or steel, its size and its length
- The posts at each end, which carry the load down
- The support below each post, all the way to the foundation, sometimes with new footings
- The connections that tie it all together
The engineer’s stamped drawings are what the city reviews for the permit. We handle the engineer’s drawings for you.
Two options
Dropped Beam or Flush Beam
Dropped beam
Hangs below the ceiling. It is usually the simpler option, and it can be finished to frame the kitchen.
Flush beam
Sits inside the ceiling for a clean, uninterrupted line, which takes more work in the floor above.
Permits
Permits and inspections
In Ontario, removing or altering a load-bearing wall needs a building permit from your municipality. The city reviews the drawings before work starts, and an inspector checks the new structure before it is covered up. We prepare and submit the application and coordinate the inspections.
Services
What is hiding in the wall
Walls often hold ducts, plumbing drains and vents, wiring and sometimes a gas line. Each needs a new route, by licensed trades, before the wall comes out. We look from the basement and the attic before we quote, so the likely reroutes are planned for.
After the wall
Your New Kitchen and Island
Once the wall is gone, the kitchen is part of your main living space, and the cabinetry is on display. Our in-house millwork team builds cabinets and islands to suit the new layout. If the engineer needs a post where the wall used to be, we can wrap it into the island or a built-in so it looks planned, not leftover.
See kitchen renovations and our renovation cost guide.
Pricing
Kitchens
Before HST and appliances. Structural work depends on your home and is included in your clear, fixed-price quote before any work starts.
In plain words
Typical Steps
Consultation
We look at the wall, basement and attic, and measure the space.
Design and engineering
Kitchen layout and structural design are worked out together, so the beam and posts suit the island and lighting.
Your quote
A clear, fixed-price quote before any work starts.
Permit
We submit the drawings and answer the city’s comments. This is often the longest wait, and it varies by municipality.
Structural work
Temporary supports go up on both sides, the wall comes out, and the posts, beam and support below go in. The city inspects.
Kitchen build
Plumbing, electrical, drywall, flooring, cabinetry, island and counters.
Walkthrough
We go over every detail with you.
The structural work is one of the shorter stages. Most of the calendar goes to design, engineering and the permit before construction, and to the kitchen build after it. Every job has a dedicated project manager and a written 2-year workmanship warranty.
Licensed & insured · WSIB-covered · Family-owned since 2015 · 5.0★ on Google · HomeStars Best of 2024
Questions
Frequently Asked Questions
Do I need a permit to remove a load-bearing wall in Ontario?
Yes. It needs a building permit, with drawings showing how the load will be carried. We prepare and submit the application for you.
Do I need an engineer to remove a load-bearing wall?
Yes. The beam, posts and support below must be designed for your home’s actual loads. The engineer’s drawings also support the permit application.
How do I know if a wall is load-bearing?
Walls that run across the joists above, sit mid-house or have support directly below often are. An engineer or qualified designer should confirm it.
Can the beam be hidden in the ceiling?
Often, yes, with a flush beam set into the floor above. The engineer confirms whether it is possible in your home.
How much does it cost to remove a load-bearing wall?
It depends on the span, the beam type, what sits above, which services need rerouting and how the ceiling and floor are finished. We price it after the engineer’s review, in a clear, fixed-price quote.
Ready to Open Up Your Kitchen?
Text us a few photos of the wall and both rooms at (416) 824-8825, or request a consultation.
We work across Toronto, York Region (Richmond Hill, Vaughan, Markham, Aurora and Newmarket), Peel, Halton and Durham.
Until December 31, 2026, the in-person consultation is complimentary. After that it is $199, credited in full to your project.
Related pages:



