Offices · Toronto & the GTA

Office Renovations & Fit-Outs

Moving into a new lease or reworking the office you have. Open-plan areas, private offices, meeting rooms, reception, lighting, kitchenettes and custom millwork, built to your landlord’s rules and around your team’s hours.

Licensed, insured & WSIB-coveredAfter-hours & weekend workPermits handledOne point of contact5.0★ on GoogleFamily-owned since 2015

Two sets of rules

Your Landlord’s Building and Your Fit-Out

Most offices sit inside someone else’s building. We work to both: the base building and your new space.

The base building

What your landlord controls

Every building has its own tenant rules. We follow them from day one.

  • Drawings approved by the landlord before work starts
  • Insurance certificates and WSIB clearance on file
  • Fire alarm and sprinkler changes by the building’s own contractors where required
  • Noisy work scheduled when the building allows it
Your fit-out

What we build for you

Everything inside your space.

  • Walls, private offices and meeting rooms
  • Ceilings, lighting, power and data
  • Reception, kitchenette and coffee station millwork
  • Flooring, paint and finishes

New space or existing space

New Lease or Staying Open

Building out a new lease

Moving into a new unit? We take it from empty shell or an old tenant’s layout to move-in day, and we can walk it with you before you sign.

Renovating while you’re open

Reworking the office you’re in? We stage the work so your team keeps working, with after-hours and weekend work where your building allows it.

Permits

Permits for Office Renovations in Toronto

When you need a permit

Adding or removing walls and installing or changing heating or plumbing need a building permit. Installing cabinetry and millwork, or repairing and replacing plumbing fixtures, generally doesn’t.

When do I need a building permit, toronto.ca ↗

What the drawings show

For interior alterations in non-residential buildings, the City asks for drawings that show demising walls, fire separations and life-safety systems.

Interior alterations guide, toronto.ca ↗

A faster lane for smaller jobs

Toronto’s express permit stream covers office alterations up to 600 m² with no change of use, with a 3-day review.

Express building permits, toronto.ca ↗

Your landlord’s tenant manual

Most commercial buildings have one: drawing approval, insurance naming the landlord, rules for noisy work, and the building’s own contractors for fire alarm changes. It isn’t law, but it decides how the job runs, so we work to it.

What business owners say

Built Around How Your Team Works

“Before we designed and built out our office space, we looked around to find the best contractor we can in regards to value, craftsmanship and timeline. I can definitely say we made the best decision by using J Group Renovations.”Toronto Sign Media · Office build-out · Google review

How it works

From First Call to Opening Day

1

Intro call

Tell us about your space, your timeline and what you need.

2

On-site consultation

$199, credited in full toward your project (complimentary until December 31, 2026). We walk and measure the space and give you a measured floor plan report.

3

Proposal

A clear scope, schedule and quote.

4

Permits & build

We handle the permits and manage the build, with one point of contact throughout.

5

Handover

A final walkthrough together. We don’t call it done until you do.

Cost

What Moves the Price of an Office Fit-Out

We price office fit-outs in person, after we’ve walked the space. You get a clear scope, schedule and quote before any work starts.

  • Size and condition of the space
  • Number of private offices and meeting rooms
  • Ceilings, lighting and HVAC changes
  • Kitchenette, reception and custom millwork
  • Base-building requirements and contractors
  • After-hours or weekend work

Questions

Office Renovation FAQ

Do you do leasehold improvements and tenant fit-outs?

Yes. We build out new leases from empty unit to move-in day, and we renovate offices that are already in use.

Can you work after hours so our team keeps working?

Yes. We schedule disruptive work outside your hours, within your building’s rules and the local noise by-law.

Do we need our landlord’s approval?

Usually, yes. Most buildings want to approve the drawings first and need insurance certificates and WSIB clearance on file. We prepare what your landlord asks for and follow the building’s tenant manual.

Do I need a permit for an office renovation?

If you’re adding or removing walls or changing heating or plumbing, yes. Cabinetry and millwork generally don’t need one. We tell you what your project needs and handle the application.

Do you build custom millwork for offices?

Yes. Coffee stations, islands, feature walls and built-ins, designed for your space and built by the same team that runs your renovation.

How much does an office fit-out cost?

It depends on the size and condition of the space, the walls and rooms you need, the mechanical and electrical work and your finishes. We price it in person after we’ve walked the space.

Planning a Move or a Refresh?

Tell us about your space and we’ll walk it with you. We respond within one business day.

Other commercial spaces we build: