Restaurants & cafés · Toronto & the GTA
Restaurant & Café Renovations
Dining rooms, bars, cafés and the kitchens behind them. We build to Ontario’s food premises rules and the City’s requirements, coordinate your kitchen equipment and mechanical trades, and get you to opening day.
Front and back of house
Two Very Different Rooms
The dining room sells the experience. The kitchen has to pass inspection. We build both.
Dining room, bar & counter
Where your guests decide whether they’ll come back.
- Layout, seating and bar or service counter
- Lighting, ceilings and acoustic finishes
- Washrooms
- Durable floors for busy service
Kitchen, prep & dish
Built to the Food Premises Regulation and coordinated with your equipment and mechanical trades.
- Floors that are tight, smooth and non-absorbent, and walls and ceilings that clean easily
- A separate hand-washing sink in every food prep area
- A dishwasher or a three-compartment sink
- Grease interceptor, hood and make-up air coordinated
The rules
What a Restaurant Has to Pass
Public health, before you build
Toronto Public Health asks you to contact them before construction or renovation begins and to submit plans showing equipment, sinks, hand basins, storage and washrooms, and the premises is inspected before opening. In York Region, you notify public health before operating, with a floor plan.
Submitting plans, Toronto Public Health ↗A grease interceptor
In Toronto and York Region, businesses that cook, process or prepare food need a grease interceptor, and the by-laws set rules for keeping it maintained.
Sewer use by-law, York Region ↗Hood, make-up air and fire suppression
Commercial cooking exhaust in Ontario is designed to NFPA 96, the standard the Building Code points to, including make-up air and a fire-suppression system that shuts off fuel and power to the cooking equipment. Your mechanical designer and the building and fire officials confirm the details.
Commercial cooking equipment guide (Ontario Building Code) ↗Change of use
Turning a store or office into a restaurant usually counts as a change of use, and a change of use needs a building permit even with no construction. Toronto also needs a zoning review before the eating establishment licence.
When do I need a building permit, toronto.ca ↗Washrooms
In an existing food premises, changing washroom floor space or fixtures needs written approval from a public health inspector first.
Food Premises Regulation reference, Ministry of Health ↗We coordinate it in one schedule with your equipment suppliers, designers and engineers. They handle their parts, and we make sure everything fits together on site.
New space or existing space
New Lease or Staying Open
Building out a new lease
Before you sign, walk the unit with us. We’ll look at where the grease interceptor and hood can go, the washrooms and whether it’s a change of use.
Renovating while you’re open
Refreshing a dining room or bar while you’re open? We stage the work around service, with after-hours and weekend work where your building allows it.
Cost
What Moves the Price of a Restaurant Build-Out
We price restaurant build-outs in person, after we’ve walked the space. You get a clear scope, schedule and quote before any work starts.
- Kitchen size, equipment and exhaust
- Grease interceptor and plumbing
- Change of use, washrooms and fire separations
- Bar, counters and custom millwork
- Dining room finishes, lighting and acoustics
- After-hours work and landlord requirements
How it works
From First Call to Opening Day
Intro call
Tell us about your space, your timeline and what you need.
On-site consultation
$199, credited in full toward your project (complimentary until December 31, 2026). We walk and measure the space and give you a measured floor plan report.
Proposal
A clear scope, schedule and quote.
Permits & build
We handle the permits and manage the build, with one point of contact throughout.
Handover
A final walkthrough together. We don’t call it done until you do.
Commercial work
Commercial Work We’re Proud Of

Toronto Congress Centre
Main entrance and lobby of a working event venue, renovated while it stayed in use.
Toronto Sign Media
“I can definitely say we made the best decision by using J Group Renovations.”
Office build-out · Google review
Questions
Restaurant Renovation FAQ
Do I need to talk to public health before I renovate?
In Toronto, yes. Toronto Public Health asks operators to contact them before construction or renovation starts and to submit plans. In York Region, you notify public health before you start operating. We help put the layout together for your submission.
Does my restaurant need a grease interceptor?
If you cook, process or prepare food in Toronto or York Region, yes. We plan it with your plumbing so it’s sized and installed to code.
Do you install kitchen hoods?
We coordinate the hood, exhaust, make-up air and fire suppression with your mechanical designer and specialist installers, and we build the kitchen around them.
Is turning a store into a restaurant a change of use?
Usually, yes, and a change of use needs a building permit even if you aren’t building anything. We check it before you sign the lease.
Can you renovate while we stay open?
Yes. We stage the work around service, with after-hours and weekend work where your building allows it.
How much does a restaurant renovation cost?
It depends on the kitchen, the plumbing and exhaust work, the dining room and your finishes. We price it in person after we’ve walked the space.
Opening or Refreshing a Restaurant?
Tell us about your space and we’ll walk it with you. We respond within one business day.
Other commercial spaces we build:



