Bathrooms are one of the most requested renovations in Toronto and the GTA, and one of the hardest to price from the outside. Here’s what full-service bathroom renovations cost in 2026, why the range is so wide, and how to plan a budget that holds up.
Updated November 2026.
Short answer: powder rooms start around $7,000, a bathroom refresh that keeps your tub and layout starts around $9,000, and full bathroom renovations start around $19,000, before HST. Tub-to-shower conversions start around $12,000 and primary ensuites around $31,000. Most full bathroom renovations land between $19,000 and $37,000. Try our renovation cost estimator →
These are J Group’s own published 2026 prices for Toronto and the GTA, not industry averages. Prices are before 13% HST, so a $30,000 bathroom comes to $33,900 with tax.
Bathroom Renovation Cost by Type and Finish Level
These ranges are for a full-service renovation: demolition, plumbing and electrical by licensed trades, waterproofing, tile, fixtures, vanity, glass, paint and a dedicated project manager. Prices are before HST.
Powder room: $7,000–$11,000 (quality), $11,000–$15,000 (premium), $15,000–$21,000 (luxury)
Full bathroom: $19,000–$27,000 (quality), $27,000–$37,000 (premium), $37,000–$55,000 (luxury)
Primary ensuite: $31,000–$46,000 (quality), $46,000–$66,000 (premium), $66,000–$96,000 or more (luxury)
Bathroom refresh (keep the tub and layout): from about $9,000
Tub-to-shower conversion: from about $12,000
Not included: HST. If we find a hidden problem or you ask for a change, we price it in writing before any extra work starts.
Bathroom Refresh vs Full Renovation
If your tub, tile and plumbing are in good shape, a refresh updates the room for well under the cost of a full renovation: a new vanity and top, toilet, faucets, mirror, lighting, fan and paint, and sometimes new floor tile. Refreshes start around $9,000 before HST.
A full renovation makes sense when tile is failing, there are signs of a leak, or you want to change the layout. Converting a tub to a walk-in shower starts around $12,000, including a full waterproofing system, tile and glass.
What a Full-Service Bathroom Renovation Includes
Demolition down to the studs and subfloor where needed, with protection for the rest of your home
Plumbing rough-in and new fixtures, and electrical for lighting, fans and heated floors
A full waterproofing system in the shower before any tile goes on
Tile, vanity, toilet, glass, mirrors, accessories, trim and paint
Permits and inspections when plumbing or electrical changes
A dedicated project manager who runs the schedule and the trades
Where the Money Goes
Labour is the largest share of a bathroom budget, often around 60% of the total, because bathrooms pack more plumbing, waterproofing and detailed tile work into each square foot than almost any other room. The rest goes to tile, the vanity and counter, fixtures, glass and ventilation. Tile choice affects both material and labour cost: large-format porcelain, mosaics and patterned layouts take more time to install well.
Choosing Tile, Fixtures and a Vanity
Finishes are where a bathroom gets its personality, and where budgets drift. A few rules of thumb help: large-format porcelain on walls and floors means fewer grout lines and easier cleaning; a textured or patterned tile works best on one feature wall or the shower floor; and matte black or brushed fixtures look best when every piece, from the shower valve to the towel bar, comes from the same family.
A floating vanity makes a small bathroom feel bigger because you can see the floor underneath, and under-vanity lighting doubles as a night light. In the shower, a recessed niche keeps bottles off the floor, and a frameless glass panel keeps sightlines open.
What Drives the Price Up
Moving fixtures: relocating a toilet, tub or shower drain means new plumbing and often new subfloor.
Tub-to-shower conversions: popular and worth it, but they need new waterproofing, a new drain and custom glass.
Curbless showers: a step-free shower needs the floor sloped to a linear drain and the whole wet area waterproofed. Read our curbless shower guide.
Heated floors, steam showers and niches: each adds wiring, framing or waterproofing.
Older homes: many Toronto houses hide aging plumbing, rot or subfloor damage that only shows up once tile comes off.
Condos: building approvals, elevator bookings and set working hours add time. See our condo bathroom guide.
How to Keep Your Bathroom Budget in Check
Keep the toilet, vanity and shower where they are if the layout works.
Use one feature tile on a single wall or the shower floor, and simpler tile everywhere else.
Choose a quality floating vanity over full custom millwork.
Pick your fixtures and tile before demolition, so nothing holds up the schedule.
Never cut corners on waterproofing and ventilation. Fixing a leak later costs far more.
How Long a Bathroom Renovation Takes
Most of our full bathroom renovations take about 3 to 4 weeks on site, from demolition to the final walkthrough. Larger ensuites, layout changes and custom glass can add time. Your project manager will give you a schedule before work starts and keep you updated every week.
Questions to Ask Before You Sign
What waterproofing system goes behind the tile, and is the shower floor waterproofed too?
Are the plumber and electrician licensed, and who pulls the permits?
How is the bathroom vented, and is the fan ducted to the outside?
Is this a clear, written quote that lists what’s included and what isn’t?
Who is my day-to-day contact, and what warranty comes with the work?
Real Bathrooms We’ve Built
Condo bathroom in the Distillery District: walk-in shower, walnut floating vanity and LED sconces.
Loft bathroom at Toy Factory Lofts: frameless glass shower and a vanity with LED underlighting.
Family bathroom in Etobicoke: 3D wall tile, a hexagon floor and a green vanity.
Curbless shower in Vaughan: a step-free shower with a linear drain and backlit niche.
Frequently Asked Questions
Do I need a permit for a bathroom renovation?
If you’re moving plumbing, adding fixtures or changing electrical, usually yes. Replacing fixtures in the same spots usually doesn’t need one. See our renovation permit guide.
Can I use my bathroom during the renovation?
Not while it’s under construction. If it’s your only bathroom, we’ll plan the schedule with you so it’s out of service for as short a time as possible.
Is a tub-to-shower conversion a good idea?
For most primary and family bathrooms, yes, especially if no one uses the tub. Many buyers still like at least one tub in the home, so if this is your only bathroom, it’s worth talking through first. Conversions start around $12,000 before HST.
How do I get an accurate price?
Start with a quick call at no cost. Our in-person consultation is $199, credited in full toward your project (complimentary until December 31, 2026), and includes a measured floor plan of your space, so your quote reflects your real bathroom and plumbing.
Planning ahead? Our 2026 renovation planning checklist walks you through budget, permits, hiring and timelines in 3 pages.
Get a Clear Quote for Your Bathroom
J Group Renovations has been renovating bathrooms across Toronto and the GTA since 2015, with one team and a dedicated project manager on every job. Request a consultation or call (416) 824-8825.