Shower-only conversions

Curbless, Walk-In and Tub-to-Shower Conversions in the GTA

Maybe the rest of your bathroom is fine, and it is only the tub you never use, or a curb that is getting harder to step over. We turn tubs and dated showers into tiled walk-in and curbless showers across Toronto and the GTA, without redoing the whole room unless you want to.

Shower-only optionWaterproofing behind the tileLevel-entry designs5.0★ on Google
Vaughan bathroom after the renovation, with a curbless walk-in shower seen from the doorway
A tub became a curbless walk-in shower in this Vaughan bathroom.

Just the shower

Shower-Only Conversions

Often the goal is one change: replace the tub or old shower, and leave the vanity, toilet and the rest of the room as they are. We offer shower-only conversions for exactly that.

We plan where the new tile meets your existing floor and walls, so the shower looks like it was always meant to be there.

Whole room instead?

Full bathroom renovations

from $19K

Before HST, with a clear, fixed-price quote before any work starts. See bathroom renovations.

Three ways to convert

Which Shower Fits Your Bathroom?

old tubglasslow curb
Tub-to-shower

Tub-to-Shower Conversion

The tub comes out, the drain and valve are adjusted as needed, and a tiled walk-in shower goes in its place, usually with glass instead of a curtain. This is not an acrylic insert: we open the walls and floor so the work behind the tile is done properly.

nichebenchframeless glass
Walk-in

Walk-In Shower

A larger, open shower with a low curb or none, frameless glass, a recessed niche and often a bench.

linear drainbathroom floorlevel entry, nothing to step over
Curbless

Curbless Shower

The shower floor sits level with the bathroom floor, so there is nothing to step over. In a house, that usually means recessing the shower floor into the floor structure, which we assess before design. On concrete slabs, such as condos and basements, curbless depends on the slab, and a low-profile curb is sometimes the better choice. A linear drain along one wall often helps.

Behind the tile

Waterproofing Done Properly

Tile and grout are not waterproof. What keeps water out of your walls, and out of the ceiling below, is the layer behind them.

On our showers, that means a full waterproofing system behind the tile and under the shower floor, a floor properly sloped to the drain, and every pipe and valve opening sealed. It is the part of the job you never see, and the part that decides whether a shower lasts. Curbless showers raise the stakes: with no curb to hold water back, the slope and drain have to be right.

Tile and groutThe finish you see. It is not waterproof.
Waterproofing systemContinuous behind the tile and under the shower floor.
Floor sloped to the drainSo water runs away instead of sitting. Critical with no curb.
Sealed openingsEvery pipe and valve opening sealed.
Walls and floor structureKept dry by everything above.

Aging in place

Level-Entry Showers for Staying Home Longer

A level-entry shower is one of the most practical changes for staying in your home longer. We plan for:

  • Level or very low entry, with room for a walker or a helper
  • Grab bars, with solid backing built into the walls so more can be added later
  • A built-in bench
  • A handheld shower on a slide bar, alongside a fixed head
  • Slip-resistant floor tile and good lighting
  • Controls you can reach from the bench

Some of this work may qualify for the federal Home Accessibility Tax Credit when someone in the home is 65 or older, or eligible for the disability tax credit. See our guide to renovation tax credits.

Good to know

Add-Ons and What to Expect

Heated floors as an add-on

Electric in-floor heating under the tile takes the chill off winter mornings and helps the floor dry faster. It runs on its own thermostat, wired by a licensed electrician. It is easiest to add when the bathroom floor is being retiled, so mention it early.

What to expect

You get a clear, fixed-price quote before any work starts, covering demolition, plumbing, waterproofing, tile, glass and any permit the work needs. During the job we protect your floors, contain dust and clean up as we go. Every job has a dedicated project manager and a written 2-year workmanship warranty.

Our work

Showers We Have Converted

The same Vaughan bathroom before, with a tub, dark green floor tile and a dated vanity
BeforeVaughan: tub and dated tile
Vaughan bathroom after the renovation, with a curbless walk-in shower seen from the doorway
AfterVaughan: curbless walk-in shower
Linear drain set into the floor of the Vaughan curbless shower
DetailLinear drain set into the floor
New walk-in shower with black wall tile and glass in a Distillery District condo, where the tub used to be
CondoDistillery District: the tub became a walk-in shower

See the curbless shower in Vaughan and the Distillery District condo bathroom, or read our curbless shower guide.

Licensed & insured · WSIB-covered · Family-owned since 2015 · 5.0★ on Google · HomeStars Best of 2024

Questions

Frequently Asked Questions

Can you convert my tub to a shower without redoing the whole bathroom?

Yes. We offer shower-only conversions, so the vanity, toilet and the rest of the room can stay as they are.

What is the difference between a walk-in shower and a curbless shower?

A walk-in shower is an open shower you step into, sometimes over a low curb. A curbless shower has no curb at all: the floor runs level from the bathroom into the shower, which makes it ideal for aging in place.

Can I have a curbless shower in a condo?

Sometimes. Condo bathrooms sit on a concrete slab, so it depends on the slab and on your building’s rules. Where curbless is not practical, a low-profile curb gives most of the benefit. See condo bathroom renovations.

Do I need a permit for a tub-to-shower conversion?

It depends on the plumbing changes. We check during the consultation and handle the permit when one is needed.

How much does a shower conversion cost?

It depends on size, drain location, curb or curbless, glass and tile. We price it after seeing the space, with a clear, fixed-price quote before any work starts.

Ready for a Better Shower?

Text us a few photos of your bathroom at (416) 824-8825, or request a consultation and we’ll come and look.

We work across Toronto, York Region (Richmond Hill, Vaughan, Markham, Aurora and Newmarket), Peel, Halton and Durham.

Until December 31, 2026, the in-person consultation is complimentary. After that it is $199, credited in full to your project.

Related pages: