A condo bathroom is a small room with a lot of rules around it. Board approvals, insurance certificates, elevator reservations and quiet hours shape the job before the first tile comes off. We plan for all of them from the start.

Insurance certificate for your buildingWSIB-registeredCorridor cleaned every day5.0★ on Google
Distillery District condo bathroom after the renovation, with a walnut floating vanity
Distillery District condo: walnut floating vanity, black-tile walk-in shower.

Step one

Start With Your Building’s Rules

Almost every condo corporation wants to know who is working in the building, when, and with what insurance. The details are in your declaration, bylaws and rules, so start by asking your property manager for the renovation package.

Work that stays within your unit’s finishes, such as new tile, a vanity or fixtures in the same place, usually goes through that standard request. Your declaration sets out exactly where your unit ends.

CONCRETE SLAB: common elementshared drain stack:common elementnew tile floormirrorfloating vanitytoiletshowerdrain line to the stackmoving a drain = coring the slab
Usually your unit: a standard renovation requestUsually common elements: may need a section 98 agreement

Section 98

Changes to Common Elements

In most Ontario condos, the concrete slab, shared drain stacks and risers, and structural walls are common elements, not part of your unit. Under section 98 of Ontario’s Condominium Act, 1998, an owner can change a common element only when:

The board approves the change

By resolution of the condominium board.

An agreement is signed

The owner and the corporation agree who pays for the change and who maintains, repairs and insures it.

Notice is registered on title

Notice of the agreement is registered against your unit’s title, so it carries over to future owners.

In a bathroom, this usually comes up when a drain has to move and the slab must be cored, or when work touches a shared stack. Boards often ask for drawings or an engineer’s review before they approve, and the owner usually covers that cost. We arrange the engineer’s drawings the board asks for, or design a layout that keeps drains where they are.

General information about the Condominium Act, 1998, not legal advice. Your declaration and your board decide.

Building rules

Rules We Plan Around

Working hours

Many buildings allow noisy work only during set weekday hours, often stricter than the city’s noise bylaw.

Elevator reservations

Deliveries come up in a reserved elevator with protective pads, and debris leaves in closed containers.

Water shut-offs

Scheduled with management, with notice to units on the same riser.

Loading and parking

Dock times and contractor parking arranged ahead.

Deposits

Some buildings hold a damage deposit until the work is signed off.

Common areas

We protect the floors from the elevator to your door, seal the work area against dust and leave the corridor clean at the end of each day.

Paperwork

Insurance certificate and WSIB

Most buildings ask the contractor for a certificate of insurance, often naming the condominium corporation, plus WSIB clearance and a description of the work. We are insured and WSIB-registered, and when your building asks, we provide a certificate of insurance naming the condominium corporation, along with our WSIB clearance, to your management office.

Waterproofing

It matters more upstairs

In a condo, a leak can reach the unit below. That is why a full waterproofing system behind the tile and under the shower floor, with a proper slope to the drain, is standard on our condo bathrooms.

Checklists

For Owners and Property Managers

For owners

Before your renovation

  • Ask management for the renovation package and building rules
  • Check whether anything touches the slab, stacks, risers or structure
  • Collect the contractor’s certificate of insurance and WSIB clearance
  • Reserve the elevator and loading dock
  • Confirm working hours and water shut-off steps
  • Tell the unit below when work starts
  • Have the approval in writing before work begins
For property managers

Before you approve

  • Certificate of insurance and WSIB clearance on file
  • Written scope, and a decision on whether a section 98 agreement is needed
  • Elevator, dock and parking reservations
  • Shut-off schedule and notice to affected units
  • Common-area protection plan and daily clean-up
  • Deposit, if your building requires one

Our work

Condo Bathrooms We Have Renovated

Full bathrooms start from $19K, before HST, and every project comes with a clear, fixed-price quote before any work starts. Every job has a dedicated project manager and a written 2-year workmanship warranty. For ideas and costs, read our condo bathroom guide.

Licensed & insured · WSIB-covered · Family-owned since 2015 · 5.0★ on Google · HomeStars Best of 2024

Questions

Frequently Asked Questions

Do I need board approval to renovate my condo bathroom?

Almost always. Most buildings want the scope, schedule and contractor insurance on file first, and changes to common elements also need a section 98 agreement.

What is a section 98 agreement?

A board-approved agreement between an owner and the condominium corporation for a change to the common elements. It sets out who pays for, maintains, repairs and insures the change, and notice of it is registered against the unit’s title.

Can I move the toilet or shower in a condo bathroom?

Sometimes. Moving a drain usually means coring the concrete slab, which needs the board’s approval, often an engineer’s review, and a section 98 agreement. Keeping drains in place is simpler.

Can I turn my condo bathtub into a walk-in shower?

Usually, yes, since the drain stays in roughly the same place. A curbless shower is harder on a concrete slab; see our curbless and walk-in shower conversions.

Can I stay in my condo during the renovation?

Most owners do, especially with a second bathroom.

Planning a Condo Bathroom?

Text us a few photos at (416) 824-8825, or request a consultation. We renovate condo bathrooms across Toronto and the GTA.

We work across Toronto, York Region (Richmond Hill, Vaughan, Markham, Aurora and Newmarket), Peel, Halton and Durham.